Categories
transport

It only took eight years

It’s a miracle! Back in 2011, the train information on this Smartbus sign at Bentleigh station was switched off. In 2016 during the level crossing removal project, the bus stop and sign were removed, then put back. For a while the sign wasn’t working, but then the bus times were switched on. But not the  ... [More]